FIELD METHOD / FIVE EVIDENCE GATES

Move missions into controlled manufacturing.

Use five evidence gates to move an industrial mission through platform choice, proof, industrialization, pilot production, and release.

How does an industrial mission become a manufacturing program?

The work advances through five evidence gates: mission definition, platform decision, system proof, industrialization, and pilot release. Each gate ends with an artifact and an explicit decision.

Gate 01

Define the mission

Describe the job, environment, payload, operating envelope, autonomy, communications, data, flight team, deployment, safety needs, and business constraints.

Ask
What must happen in the field, and what evidence will establish success?
Produce
Mission and system-requirements brief
Do not assume
That a preferred aircraft already satisfies the job.
Gate 02

Choose build, adapt, or source

Compare existing platforms, bounded configurations, adaptations, and new development against the same requirement.

Ask
What is the least-complex path that meets the requirement and business case?
Produce
Platform decision record
Do not assume
That custom development is necessary or undesirable before comparison.
Gate 03

Prove the system

Test the highest-risk mission assumptions and identify remaining technical, operational, regulatory, and commercial questions.

Ask
What evidence would change the platform or program decision?
Produce
Proof plan and open-risk register
Do not assume
That one successful demonstration establishes production readiness.
Gate 04

Industrialize the product

Resolve controlled parts, sourcing, tooling, assembly, work instructions, inspection, test, configuration, acceptance, and records.

Ask
Can another trained team build and accept the product from controlled information?
Produce
Manufacturing-readiness plan
Do not assume
That engineering knowledge will transfer informally without variation.
Gate 05

Pilot and release

Use a bounded lot to close deviations and release the product, supply chain, process, test basis, records, and support model.

Ask
What must be true before repeat production and deployment are authorized?
Produce
Production release package
Do not assume
That schedule pressure is evidence of readiness.

HANDOFF MAP

Keep ownership visible across the program.

DecisionAccountable perspectiveEvidence needed
Mission and deploymentProgram and operations ownerUse context, constraints, acceptance, support model
Product and integrationTechnical ownerArchitecture, interfaces, proof, open risks
Manufacturing releaseProduction and quality ownersControlled parts, process, inspection, test, records
Regulatory pathAssigned regulatory and operating ownersScope-specific responsibilities and approvals
Commercial basisProgram and finance ownersFunded scope, deployment range, lifecycle economics

FIELD DECISION

Move the program only when the next decision has evidence.

Start with a non-sensitive mission summary and identify the gate the program must clear next.